MolBio Meet: Difference between revisions
Jump to navigation
Jump to search
| (31 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=15MAY2009= | [[Category:Meetings]] | ||
=2010= | |||
===3SEP2010=== | |||
* Raj | |||
** Status Casuarina Genome sequencing | |||
** Outcrossing Needs to be compled and presendted on Monday | |||
** Collect RNA samples for biomass gene targets | |||
* Prasad | |||
** Association DNA completed and sent: | |||
** Working on 50 additional genes and organising for primer sysnthesis | |||
** Planning on staructure analysis before the CSIRO | |||
* Ashok | |||
** Validation population (targetting Biomass genes): Completed the 580 plants DNA isolation | |||
** Quality and Quantity check completed | |||
** Making samples ready for Sending | |||
* Nagabhushana | |||
** SSR: Ordered 50 additional primers | Checking is in progress | |||
** Hybrid confirmation: Needs to re-collect the samples | |||
** TD-GD discussion | |||
===Appraisal-APR2010=== | |||
:[[Appraisal]] | |||
===4NOV2010=== | |||
* Raj | |||
** Pollen dynamics - completed - MLTR - to be digged through.. | |||
** SSR Pipe - completed and pilot set sent for oligo synthesis | |||
** Casuarina genome sequecing - status - Presentation completed. Next with Pradeep, Kulkarni | |||
** TD-GD scoring, analysis and depiction | |||
** Tilling Genes confirmed | |||
** Transcriptomics-Tobacco: Mapping ESTs using '''bFast''' (new strategy) | |||
** Digged thorough Gene prediction (completed genewise and genscan) | |||
** Completed : 2010-11 budget, Flavour vision presentation | |||
* Prasad | |||
** Performance slides | |||
** Finalyse the money part in CSIRO trip | |||
** Could finalise 25 genes of growth related with partial sequences | |||
** To lead stage wise expression studies of isolated genes | |||
* Ashoke | |||
** Performance slides | |||
** Finalyse 2 selective profile this week in SEX marker | |||
** His part of TD-GD over | |||
* Bhushan | |||
** Performance slides | |||
** Sent pilot set of Ortho-SSR and follow up | |||
** Remaining Gels of TD-GD (5 more) | |||
=2009= | |||
===15MAY2009=== | |||
* Discussion on Introduction | * Discussion on Introduction | ||
* Nagabhusan | * Nagabhusan | ||
| Line 10: | Line 57: | ||
** Reviewed the work | ** Reviewed the work | ||
** Discussed on Expansin localization | ** Discussed on Expansin localization | ||
=22MAY2009= | ===22MAY2009=== | ||
* Discussed on Poster | * Discussed on Poster | ||
** Association mapping | ** Association mapping | ||
** Molecular markers as tools [ITC clones diversity; Hybrid confirmation; Model Natural Hybridization; Sex in Casuarina] | ** Molecular markers as tools [ITC clones diversity; Hybrid confirmation; Model Natural Hybridization; Sex in Casuarina] | ||
* XET gene (Ashoke) PCR amplification was trouble shooted (by Prasad) | * XET gene (Ashoke) PCR amplification was trouble shooted (by Prasad) | ||
= | ===05JUN2009=== | ||
=05JUN2009= | |||
* Progress | * Progress | ||
** Raj | ** Raj | ||
| Line 30: | Line 75: | ||
**** Primers are ready for PCR | **** Primers are ready for PCR | ||
** Prasad | ** Prasad | ||
*** Gene walking | |||
*** Expression studies | |||
** Ashoke | |||
*** Gene Walking | |||
**** Expansin Gene | Cloning completed | to be sent for sequencing | |||
*** Expression studies | |||
**** Ready Sample collection form different aged plants | |||
** Nagabhusana | |||
*** Gene walking | |||
*** Expression studies | |||
===12JUN2009=== | |||
* Proof of principle - evagen - what followhup | |||
** It is possible to outsource the proof of principle | |||
* RAC - by Mid JULY | |||
* Casuarina Plan | |||
** Accepted to get it done from Kovai | |||
** Species : C. juhuniana | |||
** Male Female bulks are possible | |||
* Change in timings to 3.30 pm on Friday | |||
* Status | |||
** RAJ : DNA Isolation | |||
** PRASAD : Close to 80% of the gene enrichment protocol | |||
** ASHOK : Expansin Walking Issues | |||
** NAGA : Missing | |||
===19JUN2009=== | |||
* Status | |||
** RAJ: Primer Screening ; Suggested to use the existing primers | |||
** Ashoke | ** Ashoke | ||
*** Expansin - the primers didn't work. To design new primers (degenerate) | |||
*** RACE - started and amplified first set of products | |||
*** Plan for Seminar | |||
** Nagabhusana | ** Nagabhusana | ||
*** CES A: Sent for sequencing | |||
= | ** Prasad | ||
*** | |||
= | ===26JUN2009=== | ||
* Agenda | |||
** Sample collection | Stress makes any difference ? | |||
** AFLP Kit ordering | |||
** | |||
** Raj | |||
*** Primers are fine, but HS Agarose is non-sense | |||
===17AUG2009=== | |||
*Common Stuff | |||
** DNTPs (Requirement from my side 600ul of 80ug) | |||
** Acrylamide plates order follow up - Nagabhushan | |||
** AFLP kit status - Ashoke to forward the message | |||
** LabNotebook, how do we deal it - sign every week | |||
** Equipments to Gurpreet: 1 PCR, 1 RT, 1 table top Centrifuge | |||
** Paper writing | |||
** SOL Meeting 2009 | last date for abstract 25AUG2009 - nothing this time | |||
* Raj | |||
** Outcrssing rate work looks intensive | |||
** Prasad already had a procedure for beat beating in DNA isoaltion | |||
* Prasad | |||
** Status - Gene enrichment protocol | |||
** Problem with trasformation - trouble shooting it | |||
* Ashoke | |||
** Status | |||
** Problem with trasformation - trouble shooting it | |||
* Bhushan | |||
** Status on SSR | |||
** Status on gene isolation | |||
Latest revision as of 08:41, 3 September 2010
2010
3SEP2010
- Raj
- Status Casuarina Genome sequencing
- Outcrossing Needs to be compled and presendted on Monday
- Collect RNA samples for biomass gene targets
- Prasad
- Association DNA completed and sent:
- Working on 50 additional genes and organising for primer sysnthesis
- Planning on staructure analysis before the CSIRO
- Ashok
- Validation population (targetting Biomass genes): Completed the 580 plants DNA isolation
- Quality and Quantity check completed
- Making samples ready for Sending
- Nagabhushana
- SSR: Ordered 50 additional primers | Checking is in progress
- Hybrid confirmation: Needs to re-collect the samples
- TD-GD discussion
Appraisal-APR2010
4NOV2010
- Raj
- Pollen dynamics - completed - MLTR - to be digged through..
- SSR Pipe - completed and pilot set sent for oligo synthesis
- Casuarina genome sequecing - status - Presentation completed. Next with Pradeep, Kulkarni
- TD-GD scoring, analysis and depiction
- Tilling Genes confirmed
- Transcriptomics-Tobacco: Mapping ESTs using bFast (new strategy)
- Digged thorough Gene prediction (completed genewise and genscan)
- Completed : 2010-11 budget, Flavour vision presentation
- Prasad
- Performance slides
- Finalyse the money part in CSIRO trip
- Could finalise 25 genes of growth related with partial sequences
- To lead stage wise expression studies of isolated genes
- Ashoke
- Performance slides
- Finalyse 2 selective profile this week in SEX marker
- His part of TD-GD over
- Bhushan
- Performance slides
- Sent pilot set of Ortho-SSR and follow up
- Remaining Gels of TD-GD (5 more)
2009
15MAY2009
- Discussion on Introduction
- Nagabhusan
- Reviewed the work
- Discussed on siRNA feasibilities
- Prasad
- Reviewed the work
- Need the deliverables to be concised
- Ashoke
- Reviewed the work
- Discussed on Expansin localization
22MAY2009
- Discussed on Poster
- Association mapping
- Molecular markers as tools [ITC clones diversity; Hybrid confirmation; Model Natural Hybridization; Sex in Casuarina]
- XET gene (Ashoke) PCR amplification was trouble shooted (by Prasad)
05JUN2009
- Progress
- Raj
- Project GeneFlow
- DNA Isolation from parents completed | Quantified | Working solution made
- Plants resown for gap filling of projenies
- Plants will be ready in 10 days time
- Periodical thinning is suggested for DNA isolation from Monday
- Primer screening to be started
- Project :: Frankia
- DNA isolated from 3 species | pathetic quantity
- Primers are ready for PCR
- Project GeneFlow
- Prasad
- Gene walking
- Expression studies
- Ashoke
- Gene Walking
- Expansin Gene | Cloning completed | to be sent for sequencing
- Expression studies
- Ready Sample collection form different aged plants
- Gene Walking
- Nagabhusana
- Gene walking
- Expression studies
- Raj
12JUN2009
- Proof of principle - evagen - what followhup
- It is possible to outsource the proof of principle
- RAC - by Mid JULY
- Casuarina Plan
- Accepted to get it done from Kovai
- Species : C. juhuniana
- Male Female bulks are possible
- Change in timings to 3.30 pm on Friday
- Status
- RAJ : DNA Isolation
- PRASAD : Close to 80% of the gene enrichment protocol
- ASHOK : Expansin Walking Issues
- NAGA : Missing
19JUN2009
- Status
- RAJ: Primer Screening ; Suggested to use the existing primers
- Ashoke
- Expansin - the primers didn't work. To design new primers (degenerate)
- RACE - started and amplified first set of products
- Plan for Seminar
- Nagabhusana
- CES A: Sent for sequencing
- Prasad
26JUN2009
- Agenda
- Sample collection | Stress makes any difference ?
- AFLP Kit ordering
- Raj
- Primers are fine, but HS Agarose is non-sense
17AUG2009
- Common Stuff
- DNTPs (Requirement from my side 600ul of 80ug)
- Acrylamide plates order follow up - Nagabhushan
- AFLP kit status - Ashoke to forward the message
- LabNotebook, how do we deal it - sign every week
- Equipments to Gurpreet: 1 PCR, 1 RT, 1 table top Centrifuge
- Paper writing
- SOL Meeting 2009 | last date for abstract 25AUG2009 - nothing this time
- Raj
- Outcrssing rate work looks intensive
- Prasad already had a procedure for beat beating in DNA isoaltion
- Prasad
- Status - Gene enrichment protocol
- Problem with trasformation - trouble shooting it
- Ashoke
- Status
- Problem with trasformation - trouble shooting it
- Bhushan
- Status on SSR
- Status on gene isolation